Procrastinators Anonymous is a fellowship of men and women who share their experience, strength and hope with each other that they may solve their common problem and help others to recover from chronic procrastination.
Hmm ... still quite relaxed and spaced out after my acupuncture and I don't want to lose that yet by going out and heaving concrete slabs and buckets of rubble. Maybe I will later if it doesn't rain or get dark. It has got dark! But there's only another couple of layers to go and I haven't got a date from the builder yet, so a night off won't hurt.
But I definitely will:
photograph the remaining hats and make labels
fill another box
start going to bed at 10 with a view to lights out at 11 Going to be more like 11.30 because had really fruitful prayer time - but 11 was always an ideal, and i'm quite happy with 11.30. A great improvement on 4.00 am!
shouldn’t they already try to? nope. There's something with the break numbers. Try to calculate the difference between two dates. I can find the difference between two dates with difftime function. Now I just need to figure out where to put the breaks so the first and last date are always in the seq of dates. Say I wanted eleven break points along the x axis for every plot. Plots are hourly. The difference between the start and end is 3000 hours. Ten intervals of 300 hours each. The seq should have major breaks split exactly by 300. How do I convert an object of class difftime to a numeric? I can divide difftimes as if they were numeric. I can also use as.numeric or as.double to convert to numbers. Ok I've finished one script. Now to just copy and paste the solutions to the rest. fast solution 3 lines of code and 1 edit. It was always bugging me I didn't know when data went up to from a glance on plots. Wanna put script into function to make stuff more clean. There's a lot of understanding that needs to go into the logic behind the code and I brushed something off in the past as someone else's code that I didn't need to understand. I'm fixing that now. Plots aren't updating correctly. Done
What is this thingy that says "Use suppressPackageStartupMessages to eliminate package startup messages." Why does it halt execution?I can't reproduce the error any more
I figured out why the plots didn't generate correctly. If there is an error in the scripts in R and plots don't get updated, I think that the code continues to try to run and uses curl to upload the old R plots.unfortunately the output seems fine so I know the script runs to completion with no errors.
Make a note that the other side is unconnectable. Still trying to resolve baylife who cares. I'll never get access anyways.
Check emails
Oh right I wanted to talk to WF about something. more data or why our data doesn't match the causes for the data.
CPU Utilization stuff. added some comments on what it is and how to use it.
Splunk - Show Z how to get charts and set up jobs.
Want to do more with login history. Is this thing in one table the same as this thing in another table?No, discarded. Sorry.
Innertruth's check-in
Had an MD appointment late this morning and came home exhausted.
I must complete my client's work today.
Other "to do" for today:
Run with friendran by myselfTake new medication at 10 pm(12:30 am)Throw out garbageWelcome Jalla
I'm sure you've done the right thing - this is only half-way through my second week and I am so encouraged already! Hope to see you about.
elvira's evening
Hmm ... still quite relaxed and spaced out after my acupuncture and I don't want to lose that yet by going out and heaving concrete slabs and buckets of rubble.
Maybe I will laterif it doesn't rain or get dark. It has got dark! But there's only another couple of layers to go and I haven't got a date from the builder yet, so a night off won't hurt.But I definitely will:
photograph the remaining hats and make labelsfill another boxstart going to bed at 10 with a view to lights out at 11Going to be more like 11.30 because had really fruitful prayer time - but 11 was always an ideal, and i'm quite happy with 11.30. A great improvement on 4.00 am!tila - Tues
dinner, wkly meal planSF,laundry (b, w),b/r fixVien-7-August
That's a rather colourful starter, Hypatia. Thanks.
MORNING
ONGOING
- "A procrastinator's work is never done."
Vic 8/7/12
Show up (done), CALENDER
So grateful for support,connection, and hope found here. pushed forward yesterday, chatbox again today.
8.7.12 check in Babarino
Hi all,
First thing is I need to look at to do list and prioritize after typing notes from meeting.
;
typed notes
made list-just going to power through list, A and G priorities.
My Day Today
I want to thank my Higher Power for this program, this website, telephone and online meetings, and my life.
I want to thank Hapatia for starting this trend.
Things I will do today
1. Cook and eat breakfast2. Go to the 9:30 a.m. telephone PA check-in3. Go to the 9:45 a.m. telephone CLA activity line4. Take shower5. Put clothes away
6. Go to the 12 noon telephone ACA meeting
7. Go to the 1 p.m. telephone CLA activity line
8. Eat lunch
9. Wash dishes
10. Clear tables
11. Clear chair
12. Clear floor
13. Read and work 10-11 Step for OA
14. Call my OA sponsor at 5 p.m.
15. Go to the 6 p.m. telephone OA meeting
16. Go to part of the 7 p.m. telephone OA meeting
17. Go to the 8 p.m. telephone CLA meeting
18. Go to the 9 p.m. telephone EA meeting
19. Go to the 9:30 p.m. telephone CLA activity line
20. Start my Sixth Step in NA
21. Test blood sugar twice
22. Prayer and meditation morning and evening
Thanks for letting me share
first post
Hi there everyone. i have just joined and am excitred to meet you all.
I really noticed that the past year procrastination has increased and I want to get a handle on it now- hopefully!!
plan for today tuesday
afternoon
tidy housetexts and emailsring sponsorreadingsscedule diaryedit introedit backgroundDPHRCpt 2ook at other two main articlesdecide formatLoud workplace this morning
people are talking except in my cubicle
make the graphs put up an ending date
shouldn’t they already try to? nope. There's something with the break numbers. Try to calculate the difference between two dates. I can find the difference between two dates with difftime function. Now I just need to figure out where to put the breaks so the first and last date are always in the seq of dates. Say I wanted eleven break points along the x axis for every plot. Plots are hourly. The difference between the start and end is 3000 hours. Ten intervals of 300 hours each. The seq should have major breaks split exactly by 300. How do I convert an object of class difftime to a numeric? I can divide difftimes as if they were numeric. I can also use as.numeric or as.double to convert to numbers. Ok I've finished one script. Now to just copy and paste the solutions to the rest. fast solution 3 lines of code and 1 edit. It was always bugging me I didn't know when data went up to from a glance on plots. Wanna put script into function to make stuff more clean. There's a lot of understanding that needs to go into the logic behind the code and I brushed something off in the past as someone else's code that I didn't need to understand. I'm fixing that now. Plots aren't updating correctly. DoneWhat is this thingy that says "Use suppressPackageStartupMessages to eliminate package startup messages." Why does it halt execution?I can't reproduce the error any moreI figured out why the plots didn't generate correctly. If there is an error in the scripts in R and plots don't get updated, I think that the code continues to try to run and uses curl to upload the old R plots.unfortunately the output seems fine so I know the script runs to completion with no errors.Make a note that the other side is unconnectable. Still trying to resolve baylife who cares. I'll never get access anyways.Check emailsOh right I wanted to talk to WF about something. more data or why our data doesn't match the causes for the data.CPU Utilization stuff. added some comments on what it is and how to use it.Splunk - Show Z how to get charts and set up jobs.Want to do more with login history. Is this thing in one table the same as this thing in another table?No, discarded. Sorry.Hypatia's check-in
Quiet on here so far! it's Tuesday afternoon here in the UK, and I've finally found a gap to do some paperwork.
complete LAC paperscopy ASD papersclinical governance returnteach registrarH.